3-step setup
Create building hierarchy, add products, invite installers
Taken into account your location and browser settings, this is probably the language you are looking for:
Promat is a commercial brand of the Etex Group. You can use your Promat account to login to any Etex Group website.
Discover more about Etex and your Etex account here
Create building hierarchy, add products, invite installers
Set up buildings with or without a floorplan, add custom products
Quickly report multi-service penetrations in a personalised report
Create building hierarchy, add products, invite installers
Set up buildings with or without a floorplan, add custom products
Quickly report multi-service penetrations in a personalised report
Your documents cannot be downloaded because there are no results.
You have reached your download limit. Please review your documents and select a smaller range
A technical error occured while uploading your documents, Please try again later.
Promat has supplied fire protection solutions for the structural steel frame at Dublin Airport's impressive Terminal 2 building.
"Our experience gained from working with Promat on other major projects means they are the clear choice for fire protection solutions on projects of this scale." Project Manager Giles Cranidge from Main Contractors Mace.
Architects Pascall & Watson designed the complex, which is the €600 million centrepiece of the DAA's €1.2 billion first phase transformation programme for the airport.
Over 40,000m² of Promat VERMICULUX® board has been supplied and installed by fire protection specialist Permafix Construction Solutions, providing up to two hours fire protection to the structure's steel frame.
VERMICULUX® is a lightweight non-combustible board specially engineered to provide up to 240 minutes fire resistance to structural steel. The board is resistant to moisture, will not disintegrate, warp or swell and can be installed at any time during the building programme, even before external walls have been completed and the building is enclosed.
Work began on the 75,000m² second terminal in October 2007 and was completed in November 2010. The terminal will handle 15 million passengers annually.