Save your favorites
Select and save the products and documents you need for your projects
Taken into account your location and browser settings, this is probably the language you are looking for:
Promat is a commercial brand of the Etex Group. You can use your Promat account to login to any Etex Group website.
Discover more about Etex and your Etex account here
Select and save the products and documents you need for your projects
Keep an overview of the jobsite installations from your desk
Download a full report with detailed floor plans and photos and send it to your mailbox
Select and save the products and documents you need for your projects
Keep an overview of the jobsite installations from your desk
Download a full report with detailed floor plans and photos and send it to your mailbox
Crowne Plaza Belgrade is a 4-star hotel, located in the New Belgrade business center. It is the biggest hotel in Belgrade with 387 rooms, 29 appartments, 14 conference halls, 2 restaurants, many bars, a fitness center and spa.
The building was opened in 1979 under the old name Hotel Belgrade Intercontinental, as part of the world famous Intercontinental chain. Stojan Maksimović, a Serbian architect, was the designer. The hotel operated under that name until 2006. In 2012 it was renamed to Crowne Plaza. Due to the planned reconstruction the hotel was temporarily closed in July 2012 and the work began in September that same year. The total value of the project, which included the renovation of the interior and the replacement of glass panels on the facade of the hotel was estimated at 30 million €.
During the reconstruction Promat materials were also used. In order to protect the facility against the spread of fire on the facade, a fire parapet for suspended aluminum facade was installed. The construction had been previously tested by the Central laboratory for testing materials of the IMS Institute, where fire resistance up to 120 minutes was achieved. The basis of the system consisted of the fire protective calcium silicate board, PROMATECT®-200, 20 mm thick. In total, approx. 3600 m² of the mentioned material were built in. The same solution was later used in many other hotel facilities around Serbia. In addition, approximately 3000 kg of intumescent coating PROMAPAINT®-SC1 was used for fire protection of the roof’s steel structure. Electrical installations were enclosed using PROMATECT®-L500 fire protection boards. Combustible pipe penetrations between fire compartments were protected with PROMASTOP®-U fire collars. For further technical details of the project, please contact the local Promat representative.
The hotel was re-opened at a ceremony on 28 January 2014.
Contact our technical support team with your questions on passive fire protection solutions, our products and systems or installation advice...