Cingleot Premium Logistics Centre

Project details

Building type
Industrial
ApplicationType
Fire Stopping
City
Hong Kong
Year
2023
Architect
Aedas
Contractor
Able Engineering Holdings Limited & Build King Holdings Limited (Joint Venture)

Description

The Cingleot Premium Logistics Centre will be one of the largest and most technologically advanced facilities of its kind in the region. This project is part of a massive CNY100 billion (CAD19.8 billion) global investment by the Alibaba Group to develop its global logistics network.

Applications

They utilized PROMATECT®-H 15mm board for cladding around sheet metal duct forming the smoke extraction ductwork system. This high-performance solution ensured the safety and efficiency of the smoke extraction system to achieve an impressive FRR rating of 120/120/120, providing a robust fire-resistant solution to protect the logistics center and its occupants. As experts in the field, we showcased our commitment to safety excellence.

PROMATECT®-H -a non combustible matrix engineered mineral board

Other Key Project Participants

Architect: Aedas Main Contractor: Able Engineering Holdings Limited & Build King Holdings Limited (Joint Venture)